DouYun power plant coal transformation cases

Source:湖北凯瑞知行科技有限公司     Author:凯瑞知行     Pubdate:2014-08-14     View:1318

DouYun power plant coal transformation cases

Guodian DouYun power generation co., LTD., began in June 2013 putting-in-service proactively power generation, but coal drop pipe usage is quite bad, blocked in most coal more than a dozen times a day, causing generating set is not stable, almost not through 168, seriously affect the operation safety, brings to the use and maintenance departments is very difficult, our company through 3 - DEM transshipment point technique, successfully solve the problem of the coal wall, the evaluation of customer satisfaction.

都匀电厂堵煤改造前

改造前现场情况

改造前现场情况 

After transforming the scene  

都匀电厂堵煤改造后现场情况

改造后现场情况

 

都匀电厂堵煤改造后现场情况

User comments:

都匀电厂堵煤改造后用户反馈